An exit strategy from big tech

An exit strategy is the plan with which you can leave a supplier without your organisation grinding to a halt: know what you use, be able to export your data, have tested an alternative and know a sequence. You do not have to leave to have one, but without a plan you have no choice.
Why a plan, even if you stay
A supplier can raise prices, change terms, discontinue a service or become legally out of reach. An exit plan gives you room to negotiate and meets what NIS2 and the GDPR ask of you: grip on your chain.

Seven steps
- Take inventory. Which tools, which teams, which data, which integrations?
- Rank by risk. Which tools hold sensitive data or are critical for continuity?
- Test the export. Take a full export of a representative set and see what you can do with it. Are structure, metadata and attachments preserved?
- Choose an alternative per component. Chat, video, documents, boards, AI: an integrated platform can replace several components at once, as with a European alternative to Microsoft Teams.
- Start small. One team, one project. That shows what fits before you move more.
- Run in parallel. Keep the old system while the new one is used, until you are sure.
- Wind down and record. End contracts at a convenient moment and keep what you must keep.
Legal support
The European Data Act gives users of cloud services rights to switch. Read more in the Data Act and switching.
Pitfalls
- Exporting only the files and forgetting the context (comments, permissions, history).
- Overlooking integrations that rely on the old tool.
- Wanting to move everything at once, too early.
At CoVince we do not promise automatic migration. In a demo we walk through together what fits your situation.
An example: the consultancy of a hundred and twenty people
A consultancy works with one large platform for chat, files and meetings. It decides not to move, but to make an exit plan. In week one a small group makes an inventory: seventeen tools, four of them with client files. In week two a full export of three projects is made. It turns out that the chat history is available as a file, but without the link to channels and permissions. That is valuable knowledge: the firm now knows what it would lose and can decide per component what to keep. One team starts in week six with an alternative next to the existing platform. After a quarter there is a substantiated decision, for or against.
What belongs in your inventory
- The name of the tool and its owner within the organisation.
- The supplier, its legal seat and the place of processing.
- The kind of data and its sensitivity.
- The integrations with other tools, including single sign-on.
- The export options and the format.
- The contract term, the notice period and the cost of leaving.
Communicate the switch
An exit succeeds or fails with habits, not technology. Explain why you are switching, what changes for people, when the old system closes and where they get help. Appoint a contact per team and plan short sessions in the first weeks.
Measure whether it works
- How many people use the new system weekly?
- Do agreements and actions still end up somewhere else?
- How many questions reach the helpdesk about the new system?
A failed pilot is valuable too: you learn what you need before you move more.
A realistic timeline
Do not count on a weekend. A sensible split is: the first weeks for the inventory and testing the export, then a pilot with one team of two to three months, and only then deciding how broadly to go. Most of the time is not in the data but in integrations, permissions and habits. Keep the notice period of your current contract in mind: whoever misses it pays a year longer for a system they want to leave. Put the notice date in the diary of the contract owner, even if you are not yet sure whether you will leave.
What not to expect
Do not expect a one-to-one copy. A new platform works differently, and that is the point: a switch is a chance to clear out what nobody uses any more. Do not expect a moment either when everything is ready at once. Realistically there is a period in which two systems exist side by side, and the first weeks bring more questions than the last.
Practise the exit
A plan that has never been used is an assumption. Once a year plan an exercise: take one tool, fetch the export, load it into the alternative and see what is missing. It costs an afternoon and gives you a current list of what a real switch would ask. Record the result, so that the board can see the exit is more than an intention.
What you can do on Monday
Pick the tool you depend on most. Ask the supplier for its list of export formats and fetch a trial export of one team. Open it in another environment and write down what is missing. Nothing more is needed in week one; you then have a first, honest picture of how far you are from an exit.
Frequently asked questions
What is an exit strategy?
A plan to leave a supplier without your organisation grinding to a halt: take inventory, export, test an alternative, run in parallel and wind down.
How do I start?
With an inventory of your tools and data, and a test of the export on a representative set.
Must I move everything at once?
No. Start with one team or project and expand.
Does CoVince offer automatic migration?
No, we do not promise that. In a demo we discuss what fits your situation.
How often do I test my exit?
At least once a year and at every major change of tools or contracts. An export that has never been tested is an assumption.
Who in the organisation should be involved?
IT, procurement, the data protection officer and, per team, someone who knows the way of working. The board takes the decision.